ICS is a new company, however since the begging of operation the following projects have been done or are under operation in ICS:
ICS103
Customer: |
Energetyka Lubin, Glogow, Poland |
Firing power - burner(s): |
3x12.4 MW |
Firing power - system: |
37.2 MW |
Type of burner(s): |
3 x HTB-DL-WG15, boiler KP6 |
Short description: |
Modernization of the waste gas utilization system in steam boiler KP6 installed in EC-3 department in Glogow. |
Year of commissioning: |
August 2013 |
ICS118
Customer: |
ZARMEN/Koksownia Czestochowa Nowa Sp. z o.o., Poland |
Firing power - burner(s): |
Not applicable |
Firing power - system: |
Not applicable |
Type of burner(s): |
Not applicable |
Short description: |
Execution of the conceptual design of the modernization of the steam superheater as well as a design of the steam reduction in debenzoiling and tar heating processes. |
Year of commissioning: |
June 2013 |
ICS106
Customer: |
SSAB Tunnplat AB, Borlange, Sweden |
Firing power - burner(s): |
1x507 kW |
Firing power - system: |
152 MW (firing power rate of the furnace) |
Type of burner(s): |
1 x roof burner |
Short description: |
Execution of the first step of the CFD analysis performed in order to find out the optimum nozzle geometry and location assuring the lowest NOx emissions as well as the most possible uniform temperature distribution. |
Year of commissioning: |
June 2013 |
ICS116
Customer: |
Nippon Furnace Co., Ltd (NFK), Japan |
Firing power - burner(s): |
1x0,043 MW |
Firing power - system: |
Not applicable |
Type of burner(s): |
1 x regenerative burner |
Short description: |
Execution of the 3D model and CFD analysis of the laboratory furnace. |
Year of commissioning: |
May 2013 |
ICS093
Customer: |
Combined heat and power plant (Europe) |
Firing power - burner(s): |
2x32.0 MW, 2x48.0 MW, 2x64.0 MW |
Firing power - system: |
260.0 MW |
Type of burner(s): |
6 x powder/gas burners |
Short description: |
Execution of the feasibility study of the revamping gas boiler into a powder boiler fired with a agriculture biomass (ICS contribution: CFD analysis of the combustion process that included: 3D model of the boiler, one dimensional thermal and mass balance, selection of the powder-gas burners, complete CFD analysis of the combustion process in the combustion chamber as well as technology of the reduction of the NOx emission and corrosion compounds). |
Year of commissioning: |
March 2013 |
ICS092
Customer: |
Orion Engineered Carbons, Jaslo, Poland |
Firing power - burner(s): |
2x13.0 MW |
Firing power - system: |
26.0 MW |
Type of burner(s): |
2 x triple fuel burners |
Short description: |
Execution of the technical design of the upgrading according current standards of the waste gas combustion system produced by the soot production plant for the PKK boilers. |
Year of commissioning: |
March 2013 |
ICS053
Customer: |
Elektrownia Stalowa Wola S.A., Stalowa Wola, Poland |
Firing power - burner(s): |
8x16,5 MW |
Firing power - system: |
99.0 MW |
Type of burner(s): |
8x16,5 MW dual fuel burners (biomass fuel and natural gas) |
Short description: |
Design and documentation works of combustion, grinding, biomass transporting and natural gas installations as well as delivery of the natural gas reduction stations and burners natural gas trains for Power Plant in Stalowa Wola. Supervision during erection and commissioning of the system...more information. |
Year of commissioning: |
August 2012 |
ICS072
Customer: |
Energetyka Sp. z o.o., Glogow, Poland |
Firing power - burner(s): |
3x13,7 MW |
Firing power - system: |
41,1 MW |
Type of burner(s): |
3xHTB-DL-WG15, boiler KP7 |
Short description: |
Modernization of the waste gas utilization system in steam boiler KP7 installed in EC-3 department in Glogow. |
Year of commissioning: |
June 2012 |
ICS084
Customer: |
Energa Elektrownie Ostroleka, Ostroleka, Poland |
Short description: |
Technical design of the piping of CO2 firefighting installation. |
Year of delivery: |
May 2012 |
ICS067
Customer: |
Orion Engineered Carbons Sp. z o.o., Jaslo, Poland |
Firing power - burner(s): |
2 x 13.0 MW |
Firing power - system: |
26.0 MW |
Type of boiler(s): |
Two PKK type utilization boilers |
Short description: |
Automation project of two PKK type utilization boilers. |
Year of delivery: |
January 2012 |
ICS056
Customer: |
Energa Elektrownie Ostroleka, Ostroleka, Poland |
Firing power - burner(s): |
512.0 MW |
Firing power - system: |
650 t/h |
Type of boiler(s): |
24 x powder burners |
Short description: |
Analysis of possibilty of OP-650 boiler adaptation to 100% biomass combustion |
Year of delivery: |
August 2011 |
ICS060
Customer: |
TK Energi, Koge, Denmark |
Volume of the tank: |
7 m3 |
Working pressure: |
40 bar |
Short description: |
The scope of supply covered pressure tank manufacturer selection, supervision and participation in the documentation preparation, supervision of the unit production and transportation. |
Year of delivery: |
July 2011 |
ICS019
Customer: |
SSAB Tunnplat AB, Borlange, Sweden |
Firing power - burner(s): |
9x1,150.0, 9x2,675.0 and 8x2,800.0 kW |
Firing power - system: |
56,825.0 kW |
Type of burner(s): |
9xHTB-DL1.2, 9xHTB-DL2.7 and 8xHTB-DL2.8 |
Short description: |
Installation of the Nozzle Cooling Air System in Zone 1 and Zone 2 (Upper and Bottom Preheating Zones). Modification of Double Fuel Nozzle System (DFNS) into Single Fuel Nozzle System (SFNS) in Zone 2. Revamp of a furnace shell wall and refractory lining around burners equipped with F1/F2 mode (low/high temperature mode) in Zone 2. |
Year of commissioning: |
July/August 2010 |
ICS007
Customer: |
Energetyka Sp. z o.o., Glogow, Poland |
Firing power - burner(s): |
3x13,700.0 kW |
Firing power - system: |
41,100.0 kW |
Type of burner(s): |
3xHTB-DL-WG15, boiler KP6 |
Short description: |
New combustion system for the waste gases, maximum capacity 65,000.0 Nm3/h...more information. |
Year of commissioning: |
2010/2011 |
ICS002
Customer: |
Energetyka Sp. z o.o., Glogow, Poland |
Firing power - burner(s): |
3x13,700.0 kW |
Firing power - system: |
41,100.0 kW |
Type of burner(s): |
3xHTB-DL-WG15, boiler KP7 |
Short description: |
New combustion system for the waste gases, maximum capacity 65,000.0 Nm3/h...more information. |
Year of commissioning: |
July 2009 |
ICS003
Customer: |
SSAB Tunnplat AB, Borlange, Sweden |
Firing power - burner(s): |
9x1,150.0, 9x2,675.0 and 8x2,800.0 kW |
Firing power - system: |
56,825.0 kW |
Type of burner(s): |
9xHTB-DL1.2, 9xHTB-DL2.7 and 8xHTB-DL2.8 |
Short description: |
Revamping of the heating and soaking zones of the reheating, walking beam type furnace...more information. |
Year of commissioning: |
August 2008 |
ICS001
Customer: |
Ferrostal, Gliwice, Poland |
Firing power - burner(s): |
6x1,550.0 and 4x2,300.0 kW |
Firing power - system: |
9,250.0 kW |
Type of burner(s): |
6xHRS-DL4S and 4xHRS-DL5 |
Short description: |
Revamping of the combustion system of walking beam furnace...more information. |
Year of commissioning: |
March 2008 |
PL004
Customer: |
SSAB Tunnplat AB, Borlange, Sweden |
Firing power - burner(s): |
8x3,500.0 and 9x3,850.0 kW |
Firing power - system: |
62,650.0 kW |
Type of burner(s): |
8xHTB-DL3.5 and 9xHTB-DL3.85 |
Short description: |
Revamping of the top and bottom preheating zone of the reheating, walking beam type furnace (design capacity of the furnace 300 t/h). |
Year of commissioning: |
August 2006 |
PL003
Customer: |
CORUS, Llanwern, United Kingdom |
Firing power - burner(s): |
4x5,800.0 kW |
Firing power - system: |
11,600.0 kW |
Type of burner(s): |
4xHRS-DL9 |
Short description: |
Revamping of the top preheating zone of the pusher furnace, design capacity of the furnace 300 t/h. |
Year of commissioning: |
April 2006 |
PL018
Customer: |
Poznan University of Technology, Poznan, Poland |
Firing power - burner(s): |
1x220 kW |
Firing power - system: |
220 kW |
Type of burner(s): |
1xHRS-Ux |
Short description: |
Test furnace. |
Year of commissioning: |
2004 |
PL001
Customer: |
CORUS, Ijmuiden, The Netherlands |
Firing power - burner(s): |
2x140 kW |
Firing power - system: |
140 kW |
Type of burner(s): |
2xHRS-RT-MDW7 |
Short description: |
Test furnace. |
Year of commissioning: |
2004 |
SE002
Customer: |
Royal Institute of Technology, KTH, Stockholm, Sweden |
Firing power - burner(s): |
2x140 kW |
Firing power - system: |
140 kW |
Type of burner(s): |
2xHRS-RT-MDW7 |
Short description: |
Test furnace. |
Year of commissioning: |
2002 |
SE001
Customer: |
Royal Institute of Technology, KTH, Stockholm, Sweden |
Firing power - burner(s): |
4x100 kW |
Firing power - system: |
200 kW |
Type of burner(s): |
4xHRS-DS1 |
Short description: |
Test furnace. |
Year of commissioning: |
2000 |
|
|
|