2010.03.09


 

Signing the contract for the combustion system revamp of the reheating furnace in SSAB, Tunnplat AB with the capacity 300 t/h

We are proud to inform that ICS has already signed the Contract with SSAB Tunnplat AB, Borlänge, Sweden for modification of Zone 1 and 2 in LPG reheating furnace 301 operated with propane gas.

Delivery covers installation of the Nozzle Cooling Air System in both zones, modification of Double Fuel Nozzle System (DFNS) into Single Fuel Nozzle System (SFNS) and revamp of furnace wall and refractory lining around three burners equipped with F1/F2 mode (low/high temperature mode) in Zone 2.
The installation will be finished at the beginning of August 2010.