1. Home
  2. /
  3. News
  4. /
  5. 2024.02.01

2024.02.01

Signing of the Contract for the Supply of a Swirl Burner

We are pleased to inform you that ICS S.A. has signed a contract for the execution of a project involving the supply of a gas-oil swirl burner adapted to burn mine gas with variable composition (methane content from 30 % to 60 %) for a 15 MW hot-water boiler located at PGNiG TERMIKA Energetyka Przemysłowa S.A., Jastrzębie-Zdrój Plant. The scope of the project also includes the supply of equipment and valves for the fuel and combustion-air supply installations to the burner.

Main products and services provided by ICS
Modern technologies for low-calorific waste gas combustion

Wyślij ten odnośnik do znajomego.