ICS is a new company, however since the begging of operation the following projects have been done or are under operation in ICS:

ICS278

Customer:Energetyka Sp. z o.o., Poland
Firing power – burner(s):Not applicable
Firing power – system:Not applicable
Type of burner(s):Not applicable
Short description:Execution of the project for the modernization of natural gas burners to enable combustion of E gas in boilers No. 2, 3, and 4 at Energetyka Sp. z o.o., Legnica, Poland. Completion
Year of commissioning:Q4 2025

ICS298

Customer:ENERGO-EFEKT Sp. z o.o., Poland
Firing power – burner(s):Not applicable
Firing power – system:Not applicable
Type of burner(s):Not applicable
Short description:Analysis of thermodynamic parameters and CAPEX/OPEX costs of the ZGPT system, a system for generating process steam based on counterclockwise thermodynamic cycles, along with the adaptation of the ZGPT solution for a selected production facility.
Year of commissioning:Q3 2025

ICS268

Customer:Kosmepol Sp. z o.o. (L’OREAL), Poland
Firing power – burner(s):Not applicable
Firing power – system:6.56 MW
Type of burner(s):Not applicable
Short description:Execution of a conceptual design for a multi-energy boiler plant with a steam capacity of 5 t/h at Kosmepol Sp. z o.o..
Year of commissioning:Q2 2025

ICS282

Customer:ENVIROTECH Sp. z o.o., Poland
Firing power – burner(s):Not applicable
Firing power – system:14.25 MW
Type of burner(s):Not applicable
Short description:Supply of a gas-oil burner adapted for the combustion of mine gas with a variable composition (methane content ranging from 40% to 60%) for a 14.25 MW water boiler located at PGNiG TERMIKA Energetyka Przemysłowa S.A., Jastrzębie-Zdrój Plant, along with equipment and fittings for fuel and air supply installations to the burner.
Year of commissioning:Q2 2025

ICS279

Customer:ENVIROTECH Sp. z o.o., Poland
Firing power – burner(s):Not applicable
Firing power – system:15 MW
Type of burner(s):Not applicable
Short description:Supply of a 15 MW gas-oil burner adapted for the combustion of mine gas with a methane content ranging from 30% to 60%, along with burner fittings, for a water boiler located at PGNiG TERMIKA Energetyka Przemysłowa S.A., Jastrzębie Zdrój Plant.
Year of commissioning:March 2025

ICS192

Customer:ORLEN S.A. PGNiG Division, Poland
Firing power – burner(s):2×2.5 MW
Firing power – system:5 MW
Type of burner(s):2 x HTB
Short description:Feasibility analysis of the methane emission reduction project and energy efficiency improvement at the Grodzisk Wielkopolski Denitrification Plant.
Year of commissioning:April 2024

ICS238

Customer:Energetyka Legnica, Poland
Firing power – burner(s):2×15.5 MW
Firing power – system:31.01 MW
Type of burner(s):2 x HTB
Short description:Execution of the project and modernization of the KP2 steam boiler at the EC4 Legnica Department.
Year of commissioning:December 2023

ICS242

Customer:INSTAL-FILTER S.A., Poland
Firing power – burner(s):Not applicable
Firing power – system:72 MW
Type of burner(s):Not applicable
Short description:Execution of the project, complete delivery of system components, and supervision of installation and commissioning for the NOx reduction system for two WLM-25-EM water boilers located at EC-1 Lubin.
Year of commissioning:March 2023

ICS185

Customer:ENERGIKA Zbigniew Szamalek Sp. k., Poland
Firing power – burner(s):Not applicable
Firing power – system:91.8 MW
Type of burner(s):Not applicable
Short description:Execution of the project, complete delivery of equipment, and supervision of installation and commissioning for the flue gas NOx reduction system for boilers K1, K2, K3, and K4 at MPEC Wloclawek.
Year of commissioning:March 2022

ICS199

Customer:Energetyka, Glogow, Poland
Firing power – burner(s):2×42.8 MW
Firing power – system:85.6 MW
Type of burner(s):2 x HTB
Short description:Execution of the project and modernization of the combustion system for KP6 and KP7 steam boilers at the EC3 Głogów Department.
Year of commissioning:December 2021

ICS200

Customer:ELEMONT Sp. z o.o., Poland
Firing power – burner(s):Not applicable
Firing power – system:79 MW
Type of burner(s):Not applicable
Short description:Execution of the flue gas NOx reduction system for two WR-25 boilers (No. K1 and K4), including the installation of unloading, storage, and distribution of ammonia water, as well as the combustion process optimization system (carbon monoxide reduction) for the WR-25 boiler No. K3.
Year of commissioning:December 2021

ICS220

Customer:Remak-Energomontaz S.A., Poland
Firing power – burner(s):Not applicable
Firing power – system:181.4 MW
Type of burner(s):Not applicable
Short description:Execution of the project, complete delivery of equipment, and supervision of installation and commissioning for the flue gas NOx reduction system for boilers K1, K2, K3, K4, and K5 at EC-2 CHP Plant, Energetyka Sp. z o.o.
Year of commissioning:July 2021

ICS222

Customer:PEC Pruszkow, Poland
Firing power – burner(s):Not applicable
Firing power – system:46 MW
Type of burner(s):Not applicable
Short description:Technical documentation and delivery of a complete NOx reduction system, including unloading and storage of ammonia water, along with installation.
Year of commissioning:January 2020

ICS197

Customer:PEC Suwalki, Poland
Firing power – burner(s):Not applicable
Firing power – system:32 MW
Type of burner(s):Not applicable
Short description:Technical documentation and delivery of a complete NOx reduction system, including installation.
Year of commissioning:February 2019

ICS207

Customer:Energetyka Legnica, Poland
Firing power – burner(s):2×15.5 MW
Firing power – system:31.01 MW
Type of burner(s):2 x HTB
Short description:1. Change of the co-combustion system from coal and waste gas to co-combustion of waste gas and natural gas.
2. Delivery of an air preheater.
Year of commissioning:August 2018

ICS196

Customer:Energetyka, Glogow, Poland
Firing power – burner(s):Not applicable
Firing power – system:Not applicable
Type of burner(s):Not applicable
Short description:Complete delivery of the steam reduction station with …more information.
Year of commissioning:March 2018

ICS190

Customer:Energetyka Legnica, Poland
Firing power – burner(s):2×15.5 MW
Firing power – system:31.01 MW
Type of burner(s):2 x HTB
Short description:1. Change of the co-combustion system from coal and waste gas to co-combustion of waste gas and natural gas.
2. Delivery of an air preheater.
Year of commissioning:July 2017

ICS091

Customer:SSAB Tunnplat AB, Borlange, Sweden
Firing power – burner(s):from 8.1 MW to 28.3 MW
Firing power – system:152 MW (firing power rate of the furnace)
Type of burner(s):
Short description:Technical documentation and delivery …more information.
Year of commissioning:February 2015

ICS131

Customer:Energetyka, Glogow, Poland
Firing power – burner(s):Not applicable
Firing power – system:Not applicable
Type of burner(s):Not applicable
Short description:Modernization of the combustion system in the ORG32/80 No. 5 steam boiler at EC-3 Głogów Department.
Year of commissioning:December 2014

ICS089

Customer:NCBiR, Poland
Firing power – burner(s):4×0.025 MW
Firing power – system:0.1 MW
Type of burner(s):Not applicable
Short description:Technology and market implementation of synthetic and waste gas combustion using a technology based on the modified HiTAC volumetric combustion method.
Year of commissioning:October 2014

ICS104

Customer:Energetyka Lubin, Glogow, Poland
Firing power – burner(s):38.65 MW
Firing power – system:38.65 MW
Type of burner(s):Not applicable
Short description:Determination of the technical and technological feasibility of coal consumption in the process of co-combustion with waste gas, including CFD analysis of the combustion process in the ORG-32 No. 5 steam boiler.
Year of commissioning:October 2013

ICS103

Customer:Energetyka Lubin, Glogow, Poland
Firing power – burner(s):3×12.4 MW
Firing power – system:37.2 MW
Type of burner(s):3 x HTB-DL-WG15, boiler KP6
Short description:Modernization of the waste gas utilization system in steam boiler KP6 installed in EC-3 department in Glogow.
Year of commissioning:August 2013

ICS118

Customer:ZARMEN/Koksownia Czestochowa Nowa Sp. z o.o., Poland
Firing power – burner(s):Not applicable
Firing power – system:Not applicable
Type of burner(s):Not applicable
Short description:Execution of the conceptual design of the modernization of the steam superheater as well as a design of the steam reduction in debenzoiling and tar heating processes.
Year of commissioning:June 2013

ICS106

Customer:SSAB Tunnplat AB, Borlange, Sweden
Firing power – burner(s):1×507 kW
Firing power – system:152 MW (firing power rate of the furnace)
Type of burner(s):1 x roof burner
Short description:Execution of the first step of the CFD analysis performed in order to find out the optimum nozzle geometry and location assuring the lowest NOx emissions as well as the most possible uniform temperature distribution.
Year of commissioning:June 2013

ICS116

Customer:Nippon Furnace Co., Ltd (NFK), Japan
Firing power – burner(s):1×0,043 MW
Firing power – system:Not applicable
Type of burner(s):1 x regenerative burner
Short description:Execution of the 3D model and CFD analysis of the laboratory furnace.
Year of commissioning:May 2013

ICS093

Customer:Combined heat and power plant (Europe)
Firing power – burner(s):2×32.0 MW, 2×48.0 MW, 2×64.0 MW
Firing power – system:260.0 MW
Type of burner(s):6 x powder/gas burners
Short description:Execution of the feasibility study of the revamping gas boiler into a powder boiler fired with a agriculture biomass (ICS contribution: CFD analysis of the combustion process that included: 3D model of the boiler, one dimensional thermal and mass balance, selection of the powder-gas burners, complete CFD analysis of the combustion process in the combustion chamber as well as technology of the reduction of the NOx emission and corrosion compounds).
Year of commissioning:March 2013

ICS092

Customer:Orion Engineered Carbons, Jaslo, Poland
Firing power – burner(s):2×13.0 MW
Firing power – system:26.0 MW
Type of burner(s):2 x triple fuel burners
Short description:Execution of the technical design of the upgrading according current standards of the waste gas combustion system produced by the soot production plant for the PKK boilers.
Year of commissioning:March 2013

ICS053

Customer:Elektrownia Stalowa Wola S.A., Stalowa Wola, Poland
Firing power – burner(s):8×16,5 MW
Firing power – system:99.0 MW
Type of burner(s):8×16,5 MW dual fuel burners (biomass fuel and natural gas)
Short description:Design and documentation works of combustion, grinding, biomass transporting and natural gas installations as well as delivery of the natural gas reduction stations and burners natural gas trains for Power Plant in Stalowa Wola. Supervision during erection and commissioning of the system…more information.
Year of commissioning:August 2012

ICS072

Customer:Energetyka Sp. z o.o., Glogow, Poland
Firing power – burner(s):3×13,7 MW
Firing power – system:41,1 MW
Type of burner(s):3xHTB-DL-WG15, boiler KP7
Short description:Modernization of the waste gas utilization system in steam boiler KP7 installed in EC-3 department in Glogow.
Year of commissioning:June 2012

ICS084

Customer:Energa Elektrownie Ostroleka, Ostroleka, Poland
Short description:Technical design of the piping of CO2 firefighting installation.
Year of delivery:May 2012

ICS067

Customer:Orion Engineered Carbons Sp. z o.o., Jaslo, Poland
Firing power – burner(s):2 x 13.0 MW
Firing power – system:26.0 MW
Type of boiler(s):Two PKK type utilization boilers
Short description:Automation project of two PKK type utilization boilers.
Year of delivery:January 2012

ICS056

Customer:Energa Elektrownie Ostroleka, Ostroleka, Poland
Firing power – burner(s):512.0 MW
Firing power – system:650 t/h
Type of boiler(s):24 x powder burners
Short description:Analysis of possibilty of OP-650 boiler adaptation to 100% biomass combustion
Year of delivery:August 2011

ICS060

Customer:TK Energi, Koge, Denmark
Volume of the tank:7 m3
Working pressure:40 bar
Short description:The scope of supply covered pressure tank manufacturer selection, supervision and participation in the documentation preparation, supervision of the unit production and transportation.
Year of delivery:July 2011

ICS019

Customer:SSAB Tunnplat AB, Borlange, Sweden
Firing power – burner(s):9×1,150.0, 9×2,675.0 and 8×2,800.0 kW
Firing power – system:56,825.0 kW
Type of burner(s):9xHTB-DL1.2, 9xHTB-DL2.7 and 8xHTB-DL2.8
Short description:Installation of the Nozzle Cooling Air System in Zone 1 and Zone 2 (Upper and Bottom Preheating Zones)…More information
Year of commissioning:July/August 2010

ICS007

Customer:Energetyka Sp. z o.o., Glogow, Poland
Firing power – burner(s):3×13,700.0 kW
Firing power – system:41,100.0 kW
Type of burner(s):3xHTB-DL-WG15, boiler KP6
Short description:New combustion system for the waste gases, maximum capacity 65,000.0 Nm3/h…more information.
Year of commissioning:2010/2011

ICS002

Customer:Energetyka Sp. z o.o., Glogow, Poland
Firing power – burner(s):3×13,700.0 kW
Firing power – system:41,100.0 kW
Type of burner(s):3xHTB-DL-WG15, boiler KP7
Short description:New combustion system for the waste gases, maximum capacity 65,000.0 Nm3/h…more information.
Year of commissioning:July 2009

ICS003

Customer:SSAB Tunnplat AB, Borlange, Sweden
Firing power – burner(s):9×1,150.0, 9×2,675.0 and 8×2,800.0 kW
Firing power – system:56,825.0 kW
Type of burner(s):9xHTB-DL1.2, 9xHTB-DL2.7 and 8xHTB-DL2.8
Short description:Revamping of the heating and soaking zones of the reheating, walking beam type furnace…more information.
Year of commissioning:August 2008

ICS001

Customer:Ferrostal, Gliwice, Poland
Firing power – burner(s):6×1,550.0 and 4×2,300.0 kW
Firing power – system:9,250.0 kW
Type of burner(s):6xHRS-DL4S and 4xHRS-DL5
Short description:Revamping of the combustion system of walking beam furnace…more information.
Year of commissioning:March 2008

PL004

Customer:SSAB Tunnplat AB, Borlange, Sweden
Firing power – burner(s):8×3,500.0 and 9×3,850.0 kW
Firing power – system:62,650.0 kW
Type of burner(s):8xHTB-DL3.5 and 9xHTB-DL3.85
Short description:Revamping of the top and bottom preheating zone of the reheating, walking beam type furnace (design capacity of the furnace 300 t/h).
Year of commissioning:August 2006

PL003

Customer:CORUS, Llanwern, United Kingdom
Firing power – burner(s):4×5,800.0 kW
Firing power – system:11,600.0 kW
Type of burner(s):4xHRS-DL9
Short description:Revamping of the top preheating zone of the pusher furnace, design capacity of the furnace 300 t/h.
Year of commissioning:April 2006

PL018

Customer:Poznan University of Technology, Poznan, Poland
Firing power – burner(s):1×220 kW
Firing power – system:220 kW
Type of burner(s):1xHRS-Ux
Short description:Test furnace.
Year of commissioning:2004

PL001

Customer:CORUS, Ijmuiden, The Netherlands
Firing power – burner(s):2×140 kW
Firing power – system:140 kW
Type of burner(s):2xHRS-RT-MDW7
Short description:Test furnace.
Year of commissioning:2004

SE002

Customer:Royal Institute of Technology, KTH, Stockholm, Sweden
Firing power – burner(s):2×140 kW
Firing power – system:140 kW
Type of burner(s):2xHRS-RT-MDW7
Short description:Test furnace.
Year of commissioning:2002

SE001

Customer:Royal Institute of Technology, KTH, Stockholm, Sweden
Firing power – burner(s):4×100 kW
Firing power – system:200 kW
Type of burner(s):4xHRS-DS1
Short description:Test furnace.
Year of commissioning:2000
ICS Project Report 001 – publication in PDF format
Application report ICS001
ICS Project Report 002 – publication in PDF format
Application report ICS002
ICS Project Report 003 – publication in PDF format
Application report ICS003
ICS Project Report 007 – publication in PDF format
Application report ICS007
ICS Project Report 053 – publication in PDF format
Application report ICS053