  • HTB-DL-WG, waste gas utilization (burning) system for steam boiler KP6, Energetyka Sp. z o.o., Glogow, Poland, commissioning: August 2013 - ICS103
  • Conceptual design, steam superheater as well as steam reduction in debenzoiling and tar heating processes, ZARMEN/Coke Plant Czestochowa NOWA Sp. z o.o., Poland, realization: June 2013 - ICS118
  • CFD analysis, combustion system, 152 MW, 300 t/h steel reheating furnace, walking beam type, SSAB Tunnplat AB, Borlange, Sweden, realization: June 2013 - ICS106
  • 3D modelling and CFD analysis, laboratory furnace, Nippon Furnace Co., Ltd (NFK), Japan, realization: May 2013 - ICS116
  • Feasibility study, gas boiler, combined heat and power plant, Europe, realization: March 2013 - ICS093
  • Technical design, PKK steam boilers, Orion Engineered Carbons, Jaslo, Poland, realization: March 2013 - ICS092
  • Technical design and deliveries, steam boiler with firing power rate 99 MW, fired by biomass and natural gas in Stalowa Wola Power Plant, Poland, planned commissioning: August 2012 - ICS053
  • HTB-DL-WG, waste gas utilization (burning) system for steam boiler KP7, Energetyka Sp. z o.o., Glogow, Poland; commissioning: June 2012 – ICS072
  • Technical design, piping of CO2 firefighting installation for Energa Elektrownie Ostroleka S.A., delivery: May 2012 – ICS084
  • Conceptual and technological design, two utilization boilers PKK type at Orion Engineered Carbons Sp. z o.o., Jaslo, Poland; delivery: January 2012 – ICS067
  • Research and implementation project, boiler fired by 100% biomass fuel delivery: August 2011 – ICS056
  • Delivery, nitrogen pressure tank delivery and taking over: July 2011 – ICS060
  • HTB-DL, combustion system, 128.76 MW, SSAB Tunnplat AB, Borlange, Sweden
    300 t/h steel reheating furnace, walking beam type, commissioning July/August 2010 - ICS019
  • HTB-DL-WG, waste gas utilization system, 41.1 MW, Energetyka Sp. z o.o., Glogow, Poland
    38 t/h steam boiler, ORG-32/80M type, commissioning 2010 - ICS007
  • HTB-DL-WG, waste gas utilization system, 41.1 MW, Energetyka Sp. z o.o., Glogow, Poland
    38 t/h steam boiler, ORG-32/80M type, commissioning July 2009 - ICS002
  • HTB-DL, combustion system, 128.76 MW, SSAB Tunnplat AB, Borlange, Sweden
    300 t/h steel reheating furnace, walking beam type, commissioning August 2008 - ICS003
  • HRS-DL, combustion system, 9.25 MW, Ferrostal, Gliwice, Poland
    20 t/h steel reheating furnace, walking beam type, commissioning March 2008 - ICS001
  • HTB-DL, combustion system, 62.65 MW, SSAB Tunnplat AB, Borlange, Sweden
    300 t/h steel reheating furnace, walking beam type, commissioning August 2006 - PL004*
  • HRS-DL, combustion system, 11.6 MW, CORUS, Llanwern, United Kingdom
    300 t/h pusher furnace, commissioning April 2006 - PL003*
  • HRS-Ux, combustion system, 0.22 MW, Poznan University of Technology, Poznan, Poland
    Laboratory test furnace, commissioning 2004 - PL018*
  • HRS-RT, combustion system, 0.14 MW, CORUS, Ijmuiden, The Netherlands
    Laboratory test furnace, commissioning 2004 - PL001*
  • HRS-RT, combustion system, 0.14 MW, Royal Institute of Technology, Stockholm, Sweden
    Laboratory test furnace, commissioning 2002 - SE002*
  • HRS-DS, combustion system, 0.2 MW, Royal Institute of Technology, Stockholm, Sweden
    Laboratory test furnace, commissioning 2000 - SE001*